Reorder Point Calculator

Find the safety stock and the reorder point from the average and maximum demand and lead time. This is a simple calculation that does not use statistical formulas.

Rounding (quantities are rounded to whole numbers)
Reorder point (place a new order when stock falls to this quantity) —
Breakdown
Average demand during lead time—
Safety stock—

This is a simple model. It does not guarantee a probability of stockouts. You decide which level to use for "maximum", such as a past peak or a forecast.

The values copied are whole numbers without commas.

Formulas

This tool uses the following simple approach. It is not the statistical formula (with a z-score and the standard deviation of demand) that many guides present.

The reorder point is a guide to the stock quantity at which you place an order. The idea is that stock should last even if the maximum demand continues for the maximum lead time, from the moment you order until the goods arrive.

Input conditions

Examples

Input Result
Average demand 10 units/day, maximum demand 15 units/day, average lead time 4 days, maximum lead time 6 days Average demand during lead time 40 units, safety stock 50 units, reorder point 90 units
Average demand 10 units/day, maximum demand 10 units/day, average lead time 4 days, maximum lead time 4 days Safety stock 0 units, reorder point 40 units

Limits of the simple model

The idea behind this tool

This is a simple calculation that uses the maximum demand and the maximum lead time. It does not estimate the variability of demand statistically, and it does not guarantee a stockout probability or a service level.

Explanatory articles describe the reorder point as the demand during lead time plus safety stock. How safety stock is found differs between companies and industries, and statistical methods exist (using the average and standard deviation and a service-level factor). This tool uses only the simple method above.

How this differs from inventory turnover

The Inventory Turnover Calculator measures how quickly stock turned over in a past period, from actual figures. This tool gives a guide for when to place an order from now on.

Frequently asked questions

What should I do when stock falls below the reorder point?

The reorder point is a guide to when to start ordering. In practice, also consider quantities already on order, the order size, and the supplier's terms. This tool does not use the current stock or quantities already ordered.

Which value should I use for maximum demand?

Use a value that you decide, such as the highest past figure, an upper level, or a forecast. The safety stock changes a lot depending on the level you choose.

Can the average demand be 0?

Yes. If the average demand is 0 and the maximum demand is positive, the safety stock is maximum demand × maximum lead time. If everything is 0, the result is 0 too.